• js1996(中国)官方网站

    CN
    CN
    Reference
    Reference
    All References
    Medical Waste Plasma Gasification in Yangzhou, China
    Hazardous Waste Disposal
    The 15t/d plant is a government-franchised project for medical waste treatment in Yangzhou. It serves 1,890 local medical institutions...
    Fly Ash Plasma Recycling Demo Project in Tongzhou Bay, China
    Hazardous Waste Disposal
    With a daily capacity of 100t, the plant is stalled with a multi-stage flue gas purification system to ensure optimised emission levels, and the vitri...
    Medical Waste Plasma Gasification and Melting in Hai'an, China
    Hazardous Waste Disposal
    Expanding an area of 1,335m2, the plant is equipped with the plasma gasification and melting process independently developed by us, and has completed...
    Fly Ash Plasma Melting Demo Project in Hai'an, China
    Hazardous Waste Disposal
    The world's first fly ash plasma melting demonstration project was built by us in Hai'an, with an investment of 142 million RMB. The project h...
    Explore more
    友情链接: